Customer Name: REI Agro, Haryana
Project : Turnkey Solution for a 1200 TPD Rice Mill including Design & Consultancy, Engineering, Supply of PCCs, MCC, Cable Laying & Erection, Automation and MIS Reporting.
Customer : REI AGRO, Bawal, Haryana, India
Capacity : 2 X 25 TPH
End Product : Basmati Rice
Customer Pains:
- Revamping of existing 2X 12 TPH lines to 2 X 25 TPH lines at the same premises using the same space along with 48 Silos both for Paddy and Head Rice
- Efficient design to utilize the space available – Electrical and Material Flow
- Minimize the time in Integration between electrical and Control equipment
- Reduce time to market as the complete Electrical and Automation erection, installation and commissioning takes minimum 6 months as there are more than 800 feeders
- Increase throughput from 60% to 80%
- Real time availability of data to decision maker
- Reduce the no. of operators
- Reduce breakage and improve Product quality& consistency
- Increase Energy efficiency
Results delivered:
- The overall scope delivered in 158 days resulting in 22 additional days of production @ 50 TPH for 528 hrs resulting in additional revenues of INR 30 M against an order of INR 50 M on Dyanamic Engineers – Use of LOGIX to reduce engineering time
- The overall efficiency of the plant achieved at 84% against the target of 80% from original efficieny of manual plant at 60%
- Reduction in manpower by 60%
- Line balancing leading to NIL Nuisance tripping because of Jamming and starvation
- Increased product quality and consistency due to reduction in grain breakage resulting in fetching higher market price
- Reduced downtine with fault indication software and enhanced troubleshooting
- Real time Production reports available on decision maker’s mobile phone
- Achieved SILO temperature control through ROD Type temp. sensors
- Accurate loss analysis using online Weighers and Flow Meters
- Compact design resulted in accomodating 2X25 TPH along with 48 SILOS lines in place of 2X12TPH lines in the same space
- Energy consumption reduced by 18% by use of VFDs and NIL machine idling
- Unexpected shutdowns due to Power outages reduced to almost zero due to selection given in each MCC to select source as TG or GRID/ DG
System Configuration: